I really enjoyed building this Arena,
It is really well drained with eight lateral drains on top of a perforated membrane , the actual drains are wrapped in a perfect membrane acting as a filter , then the drains are gravelled.
Clean stone is then laser levelled and compacted.
A second non woven membrane is then jointed, before f55 Mansfield fibre sand is also laser levelled.
Premium rubber chip to finish.
The fencing is also top spec using creosoted timber which will last a lifetime.
A really well drained arena that will Last.
Very boggy
Dig some out and stone a little more so the dumper kept clean wheels.
All done and rolled
Tracked digger with Rototilt and Grading beam



More farm tracks getting attention ripped up re-levelled and topped off with road planings, then vibrate rolled , makes them super smooth.
This was a great build ! The weather was fantastic , which helped get this fibre sand and rubber built on time and in budget.















Site strip laser levelled
Hole boring for the fencing
Drain runs started
Drains every 4m
Clean stone in laser levelled
Top fabric membrane in and joined
Fibre sand laser levelled
Premium rubber chip being levelled out
All soil is neatly landscaped